Elastic Networks Appendix A: Installation Requirements
08-01101-01, Rev. 1.50 BitStorm 1900 Installation and Maintenance Guide A-139
Installation Tools and Materials
The tools and materials required to install the BitStorm 1900 Access
Multiplexer shelf include the following:
4-bay mounting screws
1-medium Phillips-head screwdriver
1-cross-connect block matching the existing blocks used in the
facility MDF, such as Siemon R66, BIX, or AT&T 110 cross-con-
nect blocks
1-wiring punch-down tool intended for use with the cross-connect
block
Cross-connect jumper wires (24-AWG, quantity varies) for tip/ring
connections
BitStorm 1900 Physical Characteristics
This section specifies the physical dimensions and weight of the Bit-
Storm 1900 and filter shelves
01-00085-01 Bulk Pack 5 Fan Tray Fil-
ters
Replace every 6 months
(Required DC fan tray for
NEBs compliance)
DO NOT install a filter in
an AC fan tray only the
filter frame.
01-00084-01 DC Fan Tray 1 per BitStorm 1900 w/
MIU
(An air filter must be
installed to meet NEBs)
01-00084-02 AC Fan Tray 1 per BitStorm 1900 w/
MIU
(DO NOT install an air fil-
ter, only the air filter
frame.)
Table A-2: BitStorm 1900 Components
Part# BitStorm Component Rules/Capacity